AlphaMaven AlphaMaven

Energy storage, and continuous power supply

Reported by Privateequitywire
Oct 15, 2026· 2 min read
Save Post LinkedIn Email
Key Takeaways
  • • Triple Point, a UK-based lender, provides debt financing to UK renewable energy projects, with a focus on grid-scale battery energy storage systems (BESS).
  • • The episode of the Stories of Transformation podcast features Sean Brophy, Chief Commercial Officer at Triple Point, and Jonathan Hick, head of energy transition.
  • • Traditional banks are retreating from financing energy storage deals, a shift the discussion attributes to profitability considerations.
  • • Consistent renewable supply from wind and solar requires storage to serve the grid when generation is low, while nuclear and geothermal can already run continuously.
  • • Financeability of the storage sector, the role of cap and floor schemes, grid connection delays, and grid reforms are the key discussion topics.
Summary
Reducing fossil fuel dependence in energy grids depends on ensuring renewables can deliver power when it is needed, not only when it is generated. According to the publisher's summary, some zero-emission sources, such as nuclear and geothermal, can already run continuously, while wind and solar cannot without additional infrastructure. For wind and solar, consistent supply requires energy storage systems capable of serving the grid when generation is low.

The article is a podcast episode from the Stories of Transformation series, featuring Sean Brophy, Chief Commercial Officer at Triple Point, and Jonathan Hick, head of energy transition at the firm. Triple Point is a UK-based provider of debt financing to renewable energy projects, and its investment focus includes the development and deployment of grid-scale battery energy storage systems.

The discussion covers several themes. It addresses the retreat of traditional banks from financing these deals, which the speakers link to profitability concerns. It also outlines the different types of energy storage technologies, the steps needed to make the sector financeable, and the role of cap and floor schemes in supporting project economics. Grid connection delays and the impact of recent grid reforms are also examined as constraints on deployment.

The article does not provide deal values, fund sizes, or specific transaction figures in the material available.

Go deeper than the headline

Research every firm in this story, track the ones that matter and get the daily briefing — free for 7 days.

Start your free 7-day trial

Sources

1 outlet

AlphaMaven summarised this story from the reporting below. Each link opens the original article.

Privateequitywire Energy storage, and continuous power supply